RU EN
Izhora Pipe Mill
 | 
Health and Safety Policy
 

Health and Safety Policy

Izhora Pipe Mill manufactures large-diameter pipes for oil & gas  trunklines serving PAO Gazprom, PAO Transneft and other oil and gas companies in Russia and other countries.

Built in 2006, Izhora Pipe Mill uses the latest equipment and technologies. Quality of our processes and infrastructure is one way of demonstrating our  compliance with legal requirements in the areas of occupational safety, industrial safety and environmental protection.

Our goal is to prevent any workplace injuries, professional diseases and  harm to the environment.

To achieve this goal, we have deployed and continuously improve our  integrated management system compliant with ISO 14001 and OHSAS 18001 standards. This system is a part of our governance.

Our objectives:

  • Manage our operations and products with minimum risks for our employees and  the environment
  • Continuously look for ways to reduce:
    • Amount of waste
    • Amount of atmospheric emission
    • Unproductive consumption of irreplaceable natural resources
    • Risks associated with dangerous and hazardous manufacturing aspects.
  • Engage our employees and employees of our suppliers in occupational safety, industrial safety and environmental protection initiatives.

Our commitments:

  • Full compliance with all applicable laws and regulations on environmental protection and occupational safety
  • Choose production methods and processes that warrant employee safety and  minimize risks for our employees, employees of our suppliers, and the environment
  • Maintain transparent discussion with our employees, suppliers, consumers, contractors, regulators and other stakeholders
  • Award employees who make the greatest contribution to the improvement of  our environmental protection, industrial safety and occupational safety performance
  • Keep sufficient focus on education and training to maintain strong technical competencies of our employees, protect the environment, and ensure health and safety.

Our management is making this commitment and is accountable for  implementation of this Policy.

OAO Severstal News
August 06, 2018

PJSC Severstal will reduce its emissions to the atmosphere by almost 700 tons per year during the reconstruction of coke oven battery No. 4 (KB-4) at the Cherepovets Metallurgical Plant (CherMK).

July 26, 2018

AO Vorkutaugol has successfully completed an experiment at Pechorskaya Concentrating Mill to improve the quality of its coal concentrate.

July 19, 2018

PAO Severstal (MICEX-RTS: CHMF; LSE: SVST), one of the world’s leading vertically integrated steel and steel-related mining companies, today announces its operational results for Q2 & H1 2018.

July 19, 2018

Severstal reports Q2 & H1 2018 financial results

July 18, 2018

The Board of Directors of Severstal is recommending a dividend of 45.94 roubles per share for the three months ended 30 June 2018.

Archive
© 2009 — 2018 Severstal
Developed by Fractalla Design