RU EN
Izhora Pipe Mill
 

Business System

Business System of Severstal (BSS) is a series of projects and initiatives aimed at achieving long-term competitive advantage through operational and  organizational excellence, and customer care. The Business System of Severstal (BSS) is the logical development of more than ten years of ongoing efforts to  optimize production and standardize internal processes through many projects striving to achieve maximum efficiency of labor and production. In 2010 we integrated and formalized these into a united improvement system, which also  includes projects for corporate culture change – The Business System of  Severstal.

The five major development lines of the Business System are as follows:

  • Continuous improvement
  • Safety
  • Customer care
  • People of Severstal
  • Business standard

By August 2013, the Business System has been distributed all over the company. It covered 108 areas at Severstal Russian Steel, 31 areas at Severstal Resources and 16 areas at Severstal International.

In 2013, the Business System projects resulted in saving approximately 171  mln dollars for the Russian Steel. The ingredients for this success: reduction of production cost for cast iron, saving in consumption coefficient costs, increase in generation of own electric power and cancelling to use a part of purchased electricity, reduction of administrative costs, etc. Thousands of  employees contributed to the success of the company through implementing own  ideas, using new instruments and approaches.

In August 2013, the following projects joined major development lines of  Business System of Severstal: cross-functional projects and projects on  unblocking of bottlenecks, replacing a goal-setting system with lean KPIs. The  following cross-functional projects are top priority in 2014:

  1. Projects with key promising customers aimed at developing new products, reducing time of delivery and increasing Severstal’s delivery share in  compliance with customers demand rate;
  2. Equipment reliability control;
  3. Flow projects focused on enhancing delivery performance and developing the  lean system of motivation, which provides support to improvements in the flow;
  4. Energy efficiency;

Quality flow control means end-to-end flow quality control of products and  manufacturing process. In 2015 the Business system will still deal with cross-functional projects. New BSS projects are intended to develop brand new  quality control instruments, determine minimum level of expenses to get high quality final products with required physicochemical characteristics, reduce variability in manufacturing, speed up production and improve relationship between customers and suppliers.

OAO Severstal News
February 27, 2019

Sustainalytics, a leading independent global provider of ESG and corporate governance research and ratings to investors, has increased Severstal’s rating from 54 to 70 points (out of a possible 100) in 2018, placing the Company in 8th position out of 42 metallurgical companies from around the world. Sustainalytics also placed «Severstal» in the “Leader” category.

February 13, 2019

Severstal announces that Moody’s has upgraded its rating on Severstal to Baa2 from Baa3 and changed its outlook from positive to stable.

February 08, 2019

Izhora Pipe Mill has won several tenders to supply PAO Gazprom with over 200 thousand tons of large diameter pipes. The products will be used in the development of gas transmission capacities for the Unified Gas Supply System in the North-West Region (NEGP), as well as the construction of the Kovykta-Chayanda section of the Power of Siberia gas pipeline.

February 05, 2019

PAO Severstal announces its Q4 & FY2018 financial results for the period ended 31 December 2018.

February 05, 2019

Tenaris S.A. announced today that it will form a joint venture with PAO Severstal to build a welded pipe plant to produce OCTG products in the Surgut area, West Siberia, Russian Federation. Tenaris will have a 49% interest in the joint venture company, with Severstal owning the remaining 51%. The commencement of the project is subject to regulatory approvals and other customary conditions.

Archive
© 2009 — 2019 Severstal
Developed by Fractalla Design